Lygoe House

This Social Housing Project, required the Design, Supply & Install of Approx 3000m2 of Light Steel Frame, finished in brickwork and Zinc, with Insulation internally & externally to achieve exceptionally high ratings for Thermal & Acoustic resistance.

Perforated intumescent Fire breaks were built in to the rainscreen cavity to achieve up to 1 hour fire separation whilst maintaining the drained ventilated cavity construction required.

Though the Low level Maisonettes where straightforward the Elliptical 9 storey Tower Block posed some challenging design & installation issues, requiring co-ordination, setting out & interfaces with Windows, brickwork, Zinc, Structural steel curved balconies, concrete frame, and drylining.